Our homes · Green Hill
Villa C15
Handed overA three-storey house in the Green Hill community, finished to the owner's order.
Below you will see the floor plans, the finished house outside and inside, then its construction stage by stage.
- Three storeys
- Three bedrooms and a study
- Pool and terraces with a bay view
About the house
About the villa
The houseThree storeys on a slope, built to the owner's order. The ground floor is clad in light stone, the first floor in wood, and the second floor has white render. Retaining walls stand behind the house; a veranda and a pool are in front.
Ground floorThe kitchen, dining and living areas share one 54 m² space with panoramic windows and access to the veranda. The kitchen is white with wood finishes, an island and built-in appliances. Separate from this area are a 12 m² entrance hall, a 9 m² laundry room, a guest bathroom and a utility room under the stairs.
First floorTwo bedrooms of 23 and 20 m² with floor-to-ceiling windows and a bay view; the larger one has its own shower room. The second bathroom opens onto the hall. The same floor has a 14 m² study and a 10 m² balcony with a glass railing.
Second floorThe whole floor is the master suite: a 29 m² bedroom with a seating area, an 8 m² walk-in wardrobe and a 9 m² bathroom with a freestanding bath, two basins and a shower. The bedroom opens onto a 37 m² terrace overlooking the bay and the community.
Finishes and equipmentParquet in the rooms, large-format tile in the bathrooms, stretch ceilings with light lines. A staircase with wooden steps, lighting and a glass railing. Air conditioners and ceiling fans, underfloor heating in the bathrooms and on the ground floor, an uninterruptible power supply with batteries.
Plot and garageA veranda with a wooden deck by the pool, a paved yard, an area with a fire bowl and a concrete bench, garden paths. The garage is separate, by the access road.
Features
What the house has
- PoolBy the veranda, with a bay view
- TerracesSecond-floor terrace, balcony and poolside veranda
- Panoramic windowsIn the living room and bedrooms, with a bay view
- FacadeStone, wood and white render
- KitchenWith an island and built-in appliances
- Climate controlAir conditioners and ceiling fans
- Underfloor heatingIn the bathrooms and on the ground floor
- Stretch ceilingsWith built-in light lines
- Lit staircaseWooden steps, glass railing
- GarageSeparate, by the access road
- Fire pit areaIn the yard, with a concrete bench
- Backup powerUninterruptible power supply with batteries
Exterior
The house from outside
Floor plans
Floor plans of the house
Three bedrooms and a study on three floors; the master bedroom has its own terrace. Furniture on the plans is shown as designed.
Inside
Interior
Five photos are shown here. Use the button to see the rest.
Construction
How the house was built
- 01
Excavation
The slope was cut for the house, in places through rock.
- 02
Foundation
Concrete blinding, reinforcement and pouring of the foundation slab.
- 03
Ground floor
Columns, wall masonry and the floor slab above the ground floor.
- 04
First and second floors
Masonry, floor slabs, second-floor concrete and the roof slab.
- 05
Garage
Garage excavation, slab, walls and doors.
- 06
Facade and glazing
Facade insulation, panoramic glazing, wood and stone finishes.
- 07
Utilities
Air-conditioning lines, underfloor heating pipes, concealed frames in the bathrooms.
- 08
Roof terraces
Terrace slabs, waterproofing, tile and railing.
- 09
Plot retaining walls
Concrete retaining walls, waterproofing, stairs between levels.
- 10
Walls and staircase
Partitions, wall plastering, concrete staircase ready for finishing.
- 11
Pool
Excavation, formwork and the concrete pool shell by the terrace.
- 12
Bathrooms and tiling
Tile in the bathrooms, shower niches and kerbs, tile on the floors and staircase.
- 13
Yard and garden
Yard preparation, garden paths, the fire bowl area, the poolside deck.
- 14
Finishing
Parquet, stretch ceilings with light lines, sanitary ware, doors.
- 15
Handover
The house has been handed over to the owner; finishing work on the plot continues.