Our homes · Green Hill
Villa C12
Handed overA custom-built house in the Green Hill community.
Below you will see the finished house outside and inside, then its construction stage by stage.
- Garage with an apartment
- Lift
- Pool
About the house
About the villa
The houseTwo storeys, built to order. The facade is stone and wood-look tile; the flat roof has gravel and solar panels, with a roof terrace overlooking the bay.
Living areasA living room with a fireplace and brass-framed shelving, a kitchen with built-in appliances and a dining room by a panoramic window. A marble staircase with a wrought-iron railing connects the floors.
Bedrooms and studyBedrooms, a walk-in wardrobe with a window bench and a study with balcony access and a bay view. A laundry room with a washing machine and dryer in a built-in cabinet. Bathrooms with marble, long countertops and backlit mirrors.
EquipmentWater underfloor heating, air conditioning, heating and ventilation, water treatment. Alarm and cameras, intercom and a home network.
Terrace, pool and plotA terrace with a bioclimatic pergola by the pool. The plot was designed and built to order: a garden, a 59 m² summer kitchen, a 115 m² playground and 216 m² of paths, stone retaining walls and lavender beds.
Garage and liftA two-car garage with an apartment below it. A lift goes down from the road to the plot level.
Features
What the house has
- Bioclimatic pergolaOver the poolside terrace
- Climate controlAir conditioning, heating, ventilation
- Underfloor heatingWater-based, in the rooms of the house
- SecurityAlarm and cameras
- CommunicationsIntercom and home network
- Garage with an apartmentA two-car garage with an apartment below
- LiftFrom the road down to the plot level
- PoolBy the terrace, with a bay view
Exterior
The house from outside
Plot
A made-to-order plot
The plot was designed and built to order: a garden, a pool, a 59 m² summer kitchen, a 115 m² playground and 216 m² of paths.
Inside
Interior
Five photos are shown here. Use the button to see the rest.
Construction
How the house was built
- 01
Site preparation
Excavation, crushed-stone base, clearing of the slope.
- 02
Foundation
Formwork and reinforcement, pouring of the foundation slab.
- 03
Structure
Walls of the ground and first floors.
- 04
Retaining walls by the house
Retaining wall reinforcement, waterproofing and drainage.
- 05
Underfloor heating
Water underfloor heating in the rooms.
Summer break: construction work is restricted in Tivat during the season.
- 06
Bathrooms
Underfloor heating in the bathrooms.
- 07
Plot retaining wall
Formwork and pouring of the plot retaining wall.
- 08
Utilities around the house
Trenches and cable routes around the house.
- 09
Facade
Cladding in stone and wood-look tile, terrace by the facade.
- 10
Finishing
Staircase, windows, built-in wardrobes.
- 11
Pool
Rebar and formwork of the pool shell.
- 12
Floors and utility room
Floor insulation and screed, boiler, electrical panel, water treatment.
- 13
Roof
Flat gravel roof with solar panels.
- 14
Garden and paths
Stone paths, lawn and planting.
- 15
Handover
The house is finished and the furniture has been delivered.