Villa C12

Handed over

A custom-built house in the Green Hill community.
Below you will see the finished house outside and inside, then its construction stage by stage.

  • Garage with an apartment
  • Lift
  • Pool

About the house

About the villa

The houseTwo storeys, built to order. The facade is stone and wood-look tile; the flat roof has gravel and solar panels, with a roof terrace overlooking the bay.

Living areasA living room with a fireplace and brass-framed shelving, a kitchen with built-in appliances and a dining room by a panoramic window. A marble staircase with a wrought-iron railing connects the floors.

Bedrooms and studyBedrooms, a walk-in wardrobe with a window bench and a study with balcony access and a bay view. A laundry room with a washing machine and dryer in a built-in cabinet. Bathrooms with marble, long countertops and backlit mirrors.

EquipmentWater underfloor heating, air conditioning, heating and ventilation, water treatment. Alarm and cameras, intercom and a home network.

Terrace, pool and plotA terrace with a bioclimatic pergola by the pool. The plot was designed and built to order: a garden, a 59 m² summer kitchen, a 115 m² playground and 216 m² of paths, stone retaining walls and lavender beds.

Garage and liftA two-car garage with an apartment below it. A lift goes down from the road to the plot level.

Features

What the house has

  • Bioclimatic pergolaOver the poolside terrace
  • Climate controlAir conditioning, heating, ventilation
  • Underfloor heatingWater-based, in the rooms of the house
  • SecurityAlarm and cameras
  • CommunicationsIntercom and home network
  • Garage with an apartmentA two-car garage with an apartment below
  • LiftFrom the road down to the plot level
  • PoolBy the terrace, with a bay view

Exterior

The house from outside

Plot

A made-to-order plot

The plot was designed and built to order: a garden, a pool, a 59 m² summer kitchen, a 115 m² playground and 216 m² of paths.

Inside

Interior

Five photos are shown here. Use the button to see the rest.

Construction

How the house was built

  1. 01

    Site preparation

    Excavation, crushed-stone base, clearing of the slope.

  2. 02

    Foundation

    Formwork and reinforcement, pouring of the foundation slab.

  3. 03

    Structure

    Walls of the ground and first floors.

  4. 04

    Retaining walls by the house

    Retaining wall reinforcement, waterproofing and drainage.

  5. 05

    Underfloor heating

    Water underfloor heating in the rooms.

  6. Summer break: construction work is restricted in Tivat during the season.

  7. 06

    Bathrooms

    Underfloor heating in the bathrooms.

  8. 07

    Plot retaining wall

    Formwork and pouring of the plot retaining wall.

  9. 08

    Utilities around the house

    Trenches and cable routes around the house.

  10. 09

    Facade

    Cladding in stone and wood-look tile, terrace by the facade.

  11. 10

    Finishing

    Staircase, windows, built-in wardrobes.

  12. 11

    Pool

    Rebar and formwork of the pool shell.

  13. 12

    Floors and utility room

    Floor insulation and screed, boiler, electrical panel, water treatment.

  14. 13

    Roof

    Flat gravel roof with solar panels.

  15. 14

    Garden and paths

    Stone paths, lawn and planting.

  16. 15

    Handover

    The house is finished and the furniture has been delivered.